Vai al contenuto principale
GS Wind Turkey Documentazione completa General Methodology v2.0

Cataltepe 16MW Wind Farm Project, Turkey

GS-1007 ↗

4.3 / 10
Integrity
5.1
Transparency
4.0
Claim Safety
4.2
Documentation
3.1

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB, and the project uses a combined additionality test in the validation report.

missing Permanence is weakly documented: reversal events are not addressed in the latest validation record, and no buffer pool percentage is stated.

Transparency

verified The monitoring period is clearly stated for 2024, and the project has a named VVB, RINA Services S.p.A.

missing The record does not provide verified or claimed issuance totals, and low extraction confidence suggests at least one key document was hard to read.

Claim Safety

verified The project is a wind farm with a project baseline and a stated leakage deduction of 0%, which supports lower over-crediting risk than many land-use projects.

missing The file contains a crediting-period contradiction and no verified usage-rate evidence, which weakens confidence in the claimed climate benefit.

Documentation

verified Multiple official documents were used, including a recent validation report dated 2025-06-03.

missing The validation report lists numerous corrective actions and the extraction confidence is low, indicating incomplete or difficult-to-read documentation.

Detailed Analysis

Integrity

The validation report confirms additionality through a combined test and says the VVB, RINA Services S.p.A., verified it. The project also states a leakage deduction of 0%, and the baseline was last reassessed in 2021, which is a positive sign. However, permanence is not well supported because reversal events are marked as not addressed and no buffer pool percentage is provided.

Transparency

The monitoring period is clearly identified as 2024-03-01 to 2024-12-31, and the VVB is named in the extracted record. Still, the file does not provide verified or claimed issuance totals, and usage monitoring is not stated. Low extraction confidence further reduces transparency because at least one key source was poorly readable.

Claim Safety

Claim safety is helped by the fact that this is a wind project with a project baseline and a stated leakage deduction of 0%. Even so, the record does not show verified usage-rate evidence, and the project is marked CORSIA-eligible while CCP status is not mentioned, which leaves some dual-claim uncertainty. The contradiction on the crediting period also weakens confidence in the scale and timing of the claim.

Documentation

Documentation quality is mixed: the record shows 18 documents used and includes a recent validation report dated 2025-06-03. But the validation report lists many corrective actions, including missing stakeholder consultation evidence, logbook evidence, and meter information, which indicates gaps in the file. The low extraction confidence also suggests that at least one key document was difficult to interpret.

Overall

I privileged the 2025-06-03 validation report over older documents when facts conflicted, because it is the most recent and appears to be the highest-priority assurance source. That said, the contradictions still matter: the crediting period differs across documents, leakage justification shifts from not addressed to deemed negligible, additionality test type shifts from investment to combined, and reversal status shifts from none reported to not addressed. These inconsistencies reduce reliability, and the many corrective actions plus low extraction confidence justify a conservative overall score.

Audit Analysis

This wind project has some positive integrity signals, including VVB-confirmed additionality and a stated leakage deduction of 0%, but the record also shows unresolved permanence and documentation weaknesses. Transparency and documentation are limited by low extraction confidence, missing verified issuance figures, and multiple corrective actions in the validation report. There is also a material contradiction on the crediting period, which reduces confidence in the reliability of the file.

Project Description

Developer: Alize Enerji Elektrik Uretim Anonim Sirketi Type: Wind Size: Large Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2011-04-19 → 2025-04-18 Estimated annual credits: 39724 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action, Goal 7: Affordable and Clean Energy

Red Flags

  • The validation report lists many corrective actions and clarifications, including missing stakeholder consultation evidence, logbook evidence, and meter information.
  • The project is CORSIA-eligible, while CCP status is not mentioned, creating some dual-claim uncertainty.
  • A contradiction exists on the crediting period, with different documents indicating different end dates.

Credit Vintages

Issued Retired Available
2011
20,736 20,736 0
2012
15,133 15,133 0
2023
22,009 0 22,009
2024
5,079 69 5,010
Total 62,957 35,938 27,019

Cosa migliorerebbe questo punteggio

  • Provide a clean, reconciled document set that resolves the crediting-period and leakage/additionality contradictions.
  • Publish verified issuance totals, usage monitoring details, and complete evidence for stakeholder consultation, logbooks, and meter changes.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed test

Permanence

No buffer stated; reversals unclear

Leakage

0% deduction with negligible justification

Baseline

Project baseline; reassessment timing limited

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA-eligible; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti