CECEP Urumqi Tuoli200MW Wind Farm Phase II 49.5 MW Wind Power Project
#1159of 1935 in Renewable energy#670of 1084 in China#881of 1459 in CDM (UNFCCC)#905of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline, but the available record is limited to validation-stage documents with no monitoring or verification reports. Two material contradictions in the extracted data (leakage treatment and total ERR) are resolvable in favour of the more recent validation report, yet the absence of any verified performance data and the low extraction confidence leave significant uncertainty about actual credit delivery.
Red Flags
- No monitoring or verification reports found in the extracted record; total verified ERR is unavailable, making it impossible to confirm actual credit delivery against the 109,406 tCO₂e claimed.
- A seven-fold discrepancy in total ERR between the appendix (765,842 tCO₂e, March 2012) and the validation report (109,406 tCO₂e, June 2012) indicates a major calculation error was corrected late in validation (CAR-3), raising questions about the robustness of the original PDD.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the structured data may be incomplete or inaccurate.
- Five corrective action requests were raised during validation, including an incorrect VAT calculation in the IRR and inconsistent emission-factor calculation steps, suggesting the initial PDD had material errors.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no inherent reversal risk
0% deduction, deemed negligible (appropriate for wind)
Jurisdictional grid EF (0.89639, 2011)
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →