CECIC Zhangbei Dayangzhuang Wind Farm pre-CDM VER Project
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using a combined test in the verification report, and no material findings were reported.
missing Leakage is not clearly robust: the verification report says it was not addressed, even though the monitoring report later describes it as negligible with a 0% deduction.
Transparency
verified The project has a named verifier, a defined monitoring period, and a public Gold Standard registry reference.
missing Verified and claimed emission reductions are not stated in the extracted record, and several MRV details such as grid factor year and usage monitoring method are not found in available documents.
Claim Safety
verified The project is a wind farm under ACM0002, which generally lowers over-crediting risk compared with more complex project types.
missing The baseline is project-specific rather than a more conservative standardized or jurisdictional baseline, and leakage justification is inconsistent across documents.
Documentation
verified Three document types were used, including the verification report, PDD, and monitoring report, and the extraction confidence is medium rather than low.
missing Important fields are missing or not stated, including buffer pool coverage, baseline reassessment, and several MRV parameters, which limits documentation completeness.
Detailed Analysis
Integrity
The verification report dated 2011-01-10 confirms additionality through a combined test and reports no material findings, which is a meaningful positive. On the other hand, the report says leakage was not addressed, while the monitoring report dated 2010-12-30 says leakage was deemed negligible with a 0% deduction, so the leakage case is only moderately robust. No reversal events are described, but buffer pool coverage is not found in the extracted record and reversal treatment is not addressed in detail.
Transparency
The project has a named VVB, a defined monitoring period, and a Gold Standard registry reference, which supports basic traceability. Still, the extracted record does not include verified versus claimed emission reduction totals, and several MRV fields such as grid emission factor year and usage monitoring method are not found in available documents. That leaves the public accounting trail incomplete.
Claim Safety
As a wind project using ACM0002, the project type is generally lower risk for over-crediting than many land-use projects. However, the baseline is project-specific, the baseline reassessment timing is not stated, and leakage treatment is inconsistent between the verification report and monitoring report. CORSIA eligibility and CCP status are not stated, so dual-market claim risk cannot be ruled out from the extracted record.
Documentation
The evidence base includes the verification report, PDD, and monitoring report, which is a solid starting set, and extraction confidence is medium. Even so, several key items are missing or not stated, including buffer pool percentage, baseline reassessment, verified emission totals, and usage monitoring details. The differing crediting-period dates between the PDD and monitoring report also reduce documentation reliability.
Overall
I privileged the verification report for additionality and findings because it is the higher-priority assurance document, while I treated the monitoring report’s negligible-leakage statement as supportive but not fully resolving the inconsistency. I also privileged the monitoring report’s later crediting-period dates over the earlier PDD dates because it is more recent, but the discrepancy still lowers confidence. Overall quality is moderate: the project has a credible verification basis, but contradictions and missing MRV details prevent a stronger score.
Audit Analysis
This is a wind project with VVB-confirmed additionality and no material findings reported, which supports the integrity case. However, key items are either not stated or only partially documented, including baseline reassessment, leakage treatment, and crediting-period consistency, which weakens confidence in the claim quality.
Project Description
Developer: Goldchina Consultancy International Co., Ltd Type: Wind Size: Large scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2001-01-01 → 2006-12-31 Estimated annual credits: 103796 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth
Red Flags
- Leakage treatment is inconsistent across documents: the verification report says leakage was not addressed, while the monitoring report says it was deemed negligible.
- The crediting period differs between the PDD and the monitoring report, indicating document inconsistency and some reliability risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 32,826 | 30,105 | 2,721 | |
| Total | 32,826 | 30,105 | 2,721 |
Cosa migliorerebbe questo punteggio
- Provide a clear, document-consistent leakage assessment and explain why the 0% deduction is justified across all reports.
- Disclose verified versus claimed emission totals, baseline reassessment history, and buffer pool or reversal treatment details.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
No reversal detail; buffer not stated
0% deduction but justification inconsistent
Project baseline; reassessment not stated
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →