CECIC Zhangbei Dayangzhuang Wind Farm Project

GS-722 ↗

5.2 / 10
Integrity
5.8
Transparency
4.6
Claim Safety
4.9
Documentation
5.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using a combined test, which supports the project’s core eligibility case.

missing Leakage is not addressed in the extracted record, and reversal events are not addressed; buffer pool coverage is also not stated.

Transparency

verified The project has a named verifier, a defined monitoring period, and multiple source documents were used, which helps traceability.

missing Verified and claimed emission reductions are not available in the extracted record, and registry/claim status details are incomplete.

Claim Safety

verified The baseline is project-based under ACM0002, which is a recognized methodology for wind projects.

missing Leakage justification is unclear and the contradiction suggests one document may have quantified it while another says it was not addressed, increasing over-crediting risk.

Documentation

verified Three document types were used, and extraction confidence is high, which supports basic documentation quality.

missing The verification report still records material findings, and key items such as buffer pool, grievance mechanism, and claim status are not stated.

Detailed Analysis

Integrity

The verification report confirms additionality through a combined test and names ACM0002 with a project baseline, which is a positive sign for baseline validity. That said, leakage is recorded as not addressed, reversal events are not addressed, and buffer pool coverage is not found in the extracted record, all of which weaken permanence and environmental integrity. The report also notes material findings, though no corrective actions were required.

Transparency

The project has a named VVB, a clear monitoring period from 2013-01-01 to 2015-05-31, and multiple evidence documents were used, which supports traceability. However, the extracted record does not provide verified versus claimed emission reduction totals, and several MRV-related fields such as usage monitoring method and grid emission factor are not found. Registry and claim-status information are also incomplete in the available documents.

Claim Safety

Claim safety is only moderate because the project uses a standard wind methodology, but the leakage treatment is weakly documented. The contradiction on leakage is important: one extracted value says leakage was not addressed, while the contradiction log says another document quantified it; I privileged the more conservative reading because the extracted record does not preserve the quantified value. With no CORSIA or CCP status stated, and no verified usage-rate evidence, over-crediting and dual-claim risk remain unresolved.

Documentation

Documentation quality is fair but not strong. Three document types were used and extraction confidence is high, which helps, but the record still lacks several key fields such as buffer pool percentage, grievance mechanism, and claim-status details. The verification report also records material findings, indicating the documentation was not fully clean even if no corrective actions were required.

Overall

The project is moderately credible on additionality and baseline structure, but the evidence base is incomplete on leakage, permanence, and claim safety. I privileged the conservative leakage reading because the contradiction does not provide the quantified value in the extracted record, and the safer interpretation is that leakage treatment is not reliably documented. This is not a low-quality file overall, but the missing claim-status and permanence details keep confidence below a strong-credit threshold.

Audit Analysis

This wind project has some strengths, including VVB-confirmed additionality and a project-specific baseline under ACM0002. However, the record is weakened by missing or unclear leakage treatment, no buffer pool information, and limited evidence on safeguards and registry/claim status. Overall, it looks moderately documented but not especially robust for high-confidence credit claims.

Project Description

Developer: ClimateCare Limited Type: Wind Size: Small Scale Methodology: ACM0002 Grid-connected electricity generation from renewable sources Crediting period: 2008-10-27 → 2015-10-26 Estimated annual credits: 103796 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth

Red Flags

  • Leakage treatment is inconsistent: the record says leakage was not addressed, yet the contradiction log says another document quantified it.
  • No buffer pool, reversal history detail, or claim-status information was found, which weakens permanence and double-claim confidence.

Credit Vintages

Issued Retired Available
2013
107,437 0 107,437
2014
95,734 0 95,734
2015
49,454 0 49,454
Total 252,625 0 252,625

Cosa migliorerebbe questo punteggio

  • Provide the full leakage calculation and reconcile the contradiction between the documents so the treatment is explicit and auditable.
  • Disclose buffer pool coverage, reversal monitoring, and registry/claim status details, including whether the project is CORSIA-eligible or CCP-approved.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated

Leakage

Leakage treatment unclear

Baseline

Project baseline under ACM0002

Safeguards

Safeguards mentioned but not detailed

Double-claim

Claim status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti