Ceran's 14 de Julho Hydro Power Plant CDM Project Activity
#1483of 1935 in Renewable energy#144of 211 in Brazil#1233of 1459 in CDM (UNFCCC)#1129of 1287 in ACM0002
Audit Analysis
A CDM hydro project in Brazil validated by LRQA in 2016 with a standard jurisdictional grid baseline and a reasonable 0% leakage assumption. However, the available record contains only the validation report with six material findings (including an emission-factor calculation error), no verification or monitoring reports, and low extraction confidence, leaving the project's actual performance and additionality confirmation largely unverified in the extracted data.
Red Flags
- Six material findings in the validation report, including incorrect default efficiency values in the emission-factor calculation spreadsheet (CAR1), which could have inflated or deflated the claimed 1,119,223 tCO2e ERR
- No verification or monitoring reports found in the extracted record; the crediting period ended in April 2023 but no post-validation data is available
- Low extraction confidence across the document set, with one evidence document listed as 'unknown'
- Additionality test type and VVB confirmation are not explicitly stated in the extracted data, despite the PDD referencing a Combined tool for additionality
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 85,698 | 0 | 85,698 | |
| 2013 | 269,048 | 0 | 269,048 | |
| Total | 354,746 | 0 | 354,746 |
Risk Indicators
Assessed via Combined tool per PDD, but test type and VVB co
Avoidance project (grid displacement); no inherent reversal
0% deduction deemed negligible; consistent with grid-connect
Jurisdictional grid EF (0.365, 2014); standard CDM hydro bas
Safeguards mentioned in documents, but FPIC and grievance me
CORSIA eligibility and CCP status not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →