CGN Inner Mongolia Suniteyouqi Phase 3 Windfarm Project
#315of 1084 in China#452of 1459 in CDM (UNFCCC)#509of 1287 in ACM0002
Audit Analysis
A CDM wind project in Inner Mongolia using a standard jurisdictional grid-emission-factor baseline (ACM0002 v20.0), validated by CTI. The project is low-risk in principle (avoidance of grid electricity), but the extracted record has notable gaps in additionality documentation, monitoring detail, and CORSIA/CCP status. A minor material finding on PDD completeness was noted without corrective action.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified from available documents
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
- Monitoring period, FNRB method, and usage monitoring method are all absent from the extracted data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 239,550 | 0 | 239,550 | |
| 2022 | 285,566 | 0 | 285,566 | |
| Total | 525,116 | 0 | 525,116 |
Risk Indicators
Test type not stated in extracted record; VVB validation imp
Avoidance project (grid displacement); no reversal risk or e
0% deduction, deemed negligible — reasonable for onshore win
Jurisdictional grid-EF baseline (2017 factor), reassessed 20
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →