Skip to main content
CDMWindChinaACM0002

CGN Inner Mongolia Wuliji Phase II Wind Farm Project

CDM-5809 ↗

#1412of 1935 in Renewable energy#865of 1084 in China#1145of 1459 in CDM (UNFCCC)#1084of 1287 in ACM0002

4.5/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A CDM wind farm project with a jurisdictional baseline and a minor closed comment, but the extracted record is thin: the additionality test type is not explicitly stated, several MRV fields are absent, and a large discrepancy exists between the PDD (651,560 tCO₂e) and the validation report (93,080 tCO₂e) for total emissions reductions. Low extraction confidence and an unidentified document further limit confidence in the assessment.

Red Flags

  • Total ERR differs by a factor of ~7 between the PDD (651,560 tCO₂e, 2019-01-02) and the validation report (93,080 tCO₂e, 2019-01-03); the basis for the lower validated figure is not explained in the extracted record
  • Additionality test type and VVB confirmation are not stated in the extracted data, leaving the additionality assessment unverified in this review
  • One of the four evidence documents is listed as 'unknown', and minimum extraction confidence is rated low, indicating at least one key document was poorly readable
  • Monitoring period, FNRB method, usage monitoring method, and buffer pool percentage are all absent from the extracted record

Credit Vintages

IssuedRetiredAvailable
2013
79,737079,737
2020
483,9580483,958
Total563,6950563,695

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Avoidance project; no reversal risk

Leakage

Deemed negligible; appropriate for wind

Baseline

Jurisdictional; reassessed 2019

Safeguards

Mentioned; FPIC and grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents