CGN Inner Mongolia Zhurihe Phase I Wind Farm Project
#1502of 1935 in Renewable energy#950of 1084 in China#1261of 1459 in CDM (UNFCCC)#1149of 1287 in ACM0002
Audit Analysis
A CDM wind project validated by CTI with a jurisdictional baseline and a reasonable 0% leakage deduction, but the extracted record is thin: additionality details, verified ERR figures, monitoring data, and safeguards information are all absent. The low extraction confidence and a seven-fold discrepancy in claimed ERR between the validation report and an unidentified source limit confidence in the project's data integrity.
Red Flags
- Additionality test type and VVB confirmation are not stated in any extracted document, leaving a critical CDM requirement unverified in the available record
- Claimed ERR of 104,190 tCO₂e in the validation report conflicts with a figure of 729,330 from an unidentified source — a 7× discrepancy that cannot be reconciled
- No verified ERR, monitoring period, or FNRB data found in the extracted record, preventing any delivery-vs-claim assessment
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 259,243 | 0 | 259,243 | |
| 2018 | 268,802 | 0 | 268,802 | |
| Total | 528,045 | 0 | 528,045 |
Risk Indicators
Test not stated in extracted record; VVB validation implies
Avoidance project (wind); no reversal risk; no reversal even
0% deduction deemed negligible; appropriate for grid-connect
Jurisdictional grid EF (0.8405, 2017); reassessed 2019
FPIC, grievance mechanism, and benefit-sharing not stated in
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →