CGN Inner Mongolia Zhurihe Phase II Wind Farm Project
#1468of 1935 in Renewable energy#918of 1084 in China#1214of 1459 in CDM (UNFCCC)#1122of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in Inner Mongolia using the standard ACM0002 methodology with a jurisdictional baseline and a 2017 grid emission factor of 0.8405. The project's core design elements (baseline, leakage treatment, methodology) are sound, but the available documentation is limited to a validation report and PDD with no monitoring or verification data, and the additionality assessment — a mandatory CDM criterion — could not be confirmed in the extracted record. The ERR figures in the PDD and validation report differ by a factor of seven, which is consistent with a lifetime-versus-annual basis but is not explicitly clarified in the documents.
Red Flags
- Additionality test type and VVB confirmation are not found in the extracted record, despite being a mandatory CDM criterion; the low extraction confidence may explain this gap but it cannot be verified
- No monitoring reports or verified ERR data are available; the project's actual performance relative to its claimed 105,544 tCO₂e (first period) or 738,808 tCO₂e (lifetime) cannot be assessed
- The PDD states a total of 738,808 tCO₂e while the validation report states 105,544 tCO₂e; although the 7× ratio matches the 7-year crediting period, neither document explicitly clarifies the reporting basis
- Low extraction confidence across the document set means key fields (FNRB, usage rate, monitoring method, CORSIA/CCP status) are unconfirmed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 126,017 | 0 | 126,017 | |
| 2018 | 237,641 | 0 | 237,641 | |
| Total | 363,658 | 0 | 363,658 |
Risk Indicators
Test not confirmed in extracted record
Wind project, no inherent reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional, grid EF 0.8405, reassessed 2019
Mentioned and benefit sharing described; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →