CGN Jilin Daan Laifu Wind Farm Phase I Project
#1352of 1935 in Renewable energy#818of 1084 in China#1083of 1459 in CDM (UNFCCC)#1045of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a jurisdictional baseline and a 7-year crediting period (2020–2027), validated by CCSC. The project carries a material finding (CAR 1) regarding an inconsistency in the build-margin emission factor calculation, and a significant discrepancy in reported emission reduction figures between the validation report and an earlier appendix. Additionality test details and monitoring data are absent from the extracted record, limiting confidence in the credit quantity.
Red Flags
- CAR 1: build-margin emission factor calculation inconsistent with Tool v7.0, requiring PDD revision — the baseline quantity may have been miscalculated at validation
- Contradiction in total emission reductions: 700,273 tCO₂e (validation report, Nov 2020) vs 100,039 tCO₂e (appendix, Jun 2020) — a roughly 7× gap that undermines confidence in the credit quantity
- Additionality test type and VVB confirmation are not stated in any extracted document, leaving a critical CDM requirement unverified in the available record
- No monitoring report or monitoring period data found; the project is mid-crediting-period (2020–2027) with no evidence of periodic verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 302,017 | 0 | 302,017 | |
| 2022 | 349,107 | 0 | 349,107 | |
| Total | 651,124 | 0 | 651,124 |
Risk Indicators
Test type not stated in extracted documents; project was val
Wind avoidance project; no reversal risk
0% deduction, deemed negligible — consistent with grid-conne
Jurisdictional baseline, 2020 reassessment, but CAR 1 flags
Safeguards and benefit-sharing mentioned; FPIC and grievance
CCP status and CORSIA eligibility not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →