CGN Jilin Sipingshanmen Wind Farm Phase I Project
#484of 1935 in Renewable energy#193of 1084 in China#314of 1459 in CDM (UNFCCC)#362of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China using a jurisdictional baseline and ACM0002 methodology, validated by Shenzhen CTI in 2020. The project is structurally sound for a wind avoidance credit, but the extracted record has notable gaps in additionality documentation, monitoring details, and CORSIA/CCP status. The apparent ERR discrepancy between the PDD and validation report resolves to a difference in reporting basis (7-year total vs. single monitoring period).
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, creating an evidence gap for a core CDM requirement
- Monitoring period, FNRB method, and usage monitoring method are all absent from the available documents, limiting verifiability of the 92,450 tCO2e figure
- CORSIA eligibility and CCP status are not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 480,180 | 0 | 480,180 | |
| Total | 480,180 | 0 | 480,180 |
Risk Indicators
Test not stated in extracted record
Avoidance project, no reversal risk
Deemed negligible, reasonable for wind
Jurisdictional, reassessed 2020
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →