Skip to main content
CDMWindChinaACM0002

CGN Liaoning Paoya Dabeishan Wind Power Project

CDM-5747 ↗

#1452of 1935 in Renewable energy#906of 1084 in China#1196of 1459 in CDM (UNFCCC)#1111of 1287 in ACM0002

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM wind power project in China with a jurisdictional baseline and a named VVB (CCSC), but significant documentation gaps including unstated additionality testing, no buffer pool, and a material finding requiring PDD correction on emission factor calculation. The low extraction confidence and a contradiction in crediting period dates further limit confidence in the project's data integrity.

Red Flags

  • Material finding (CAR-1) identified an inconsistency in the PDD's emission factor calculation relative to Tool v7.0, requiring corrective action before full compliance
  • Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality claim unverified in the extracted record
  • Low extraction confidence across the document set reduces reliability of all extracted figures

Credit Vintages

IssuedRetiredAvailable
2023
670,1980670,198
Total670,1980670,198

Risk Indicators

Additionality

Test type not stated; VVB confirmation absent from record

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible; reasonable for grid-connected wind

Baseline

Jurisdictional baseline, reassessed 2020

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents