CGN Liaoning Paoya Dabeishan Wind Power Project
#1452of 1935 in Renewable energy#906of 1084 in China#1196of 1459 in CDM (UNFCCC)#1111of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and a named VVB (CCSC), but significant documentation gaps including unstated additionality testing, no buffer pool, and a material finding requiring PDD correction on emission factor calculation. The low extraction confidence and a contradiction in crediting period dates further limit confidence in the project's data integrity.
Red Flags
- Material finding (CAR-1) identified an inconsistency in the PDD's emission factor calculation relative to Tool v7.0, requiring corrective action before full compliance
- Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality claim unverified in the extracted record
- Low extraction confidence across the document set reduces reliability of all extracted figures
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 670,198 | 0 | 670,198 | |
| Total | 670,198 | 0 | 670,198 |
Risk Indicators
Test type not stated; VVB confirmation absent from record
mixed evidence / unresolved risk
Deemed negligible; reasonable for grid-connected wind
Jurisdictional baseline, reassessed 2020
Safeguards and benefit sharing mentioned; FPIC and grievance
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →