CGN Luoding Yapoji Wind Power Project
#753of 1935 in Renewable energy#369of 1084 in China#525of 1459 in CDM (UNFCCC)#583of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and reasonable leakage treatment, but significant gaps in extracted data regarding additionality testing, monitoring methodology, and FNRB. The ERR figure discrepancy between the PDD and validation report is explainable as an annual-versus-lifetime reporting difference, though it still reflects a documentation inconsistency. No material compliance issues were found, and the project's wind-power nature inherently limits permanence and leakage risk.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverifiable from available documents
- No monitoring report data is present in the evidence set; the monitoring period, FNRB method, and usage monitoring method are all unrecorded
- The PDD reports a lifetime ERR of 432,488 tCO2e while the validation report states 61,784 tCO2e — although consistent as annual vs. 7-year total, the inconsistency in how the figure is labelled across documents could cause confusion in registry records
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted data; project was validate
Wind avoidance project; no reversal risk or events recorded
0% deduction with 'deemed negligible' justification — approp
Jurisdictional baseline, 2017 grid EF, reassessed at project
Safeguards mentioned and benefit sharing described, but FPIC
CORSIA and CCP statuses not stated; dual-channel risk unasse
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →