CGN Menghai Padingliangzi Wind Farm Project
#603of 1935 in Renewable energy#281of 1084 in China#408of 1459 in CDM (UNFCCC)#462of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a jurisdictional baseline and no material findings, but with notable gaps in additionality documentation and the absence of any monitoring reports in the available record. The project is inherently low-risk on permanence given the wind energy technology, and the 0% leakage deduction is reasonable for this sector. Overall a moderate-quality credit with standard CDM-era documentation.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified from available documents
- No monitoring reports are present in the evidence set; the only ERR figure (484,428 tCO₂e) is the ex-ante validation estimate with no post-implementation verification data
- CDM registry is in the process of being phased out under the Paris Agreement, creating long-term credit validity uncertainty
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in record
Wind energy – no reversal risk
Negligible – appropriate for wind
Jurisdictional, reassessed 2020
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →