CGN Mishan Linhe Wind Power Project

CDM-6980 ↗

#1513of 1935 in Renewable energy#954of 1084 in China#1283of 1459 in CDM (UNFCCC)#1157of 1287 in ACM0002

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A CDM wind power project in China validated by CTI with a standard jurisdictional baseline and reasonable 0% leakage assumption, but the extracted record contains a significant 7× discrepancy between the PDD and validation report on expected emissions reductions, and key additionality details are absent from the available documents. The project is inherently low-risk (avoidance-type wind generation), yet the documentation and transparency gaps limit confidence in the full compliance picture.

Red Flags

  • 7× discrepancy in expected emissions reductions: the PDD (2020-06-10) states 675,395 tCO₂e while the validation report (2020-06-15) states 96,485 tCO₂e; the validated figure was privileged as the authoritative VVB determination
  • Additionality test type and VVB confirmation are not documented in the extracted record, leaving a critical CDM requirement unverified in the available evidence
  • No monitoring reports found despite the crediting period running from October 2019, and the minimum extraction confidence across documents is rated low
  • One of the four source documents is listed as 'unknown', reducing traceability of the evidence base

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test not documented in extracted record; project was validat

Permanence

Avoidance project (wind); no reversal risk identified

Leakage

0% deduction, deemed negligible; appropriate for grid-connec

Baseline

Jurisdictional baseline, reassessed 2020, grid EF 0.9139 (20

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA eligibility and CCP status not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents