Skip to main content
CDMWindChinaACM0002

CGN Ningan Laoyeling Wind Power Project

CDM-6791 ↗

#1160of 1935 in Renewable energy#671of 1084 in China#882of 1459 in CDM (UNFCCC)#906of 1287 in ACM0002

4.9/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A CDM wind power project in China using a jurisdictional baseline and ACM0002 methodology, with a 7-year crediting period (2019–2026). The project is structurally sound for a wind avoidance project, but the extracted record lacks explicit additionality confirmation, monitoring data, and safeguards detail, limiting confidence in the full compliance picture.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the available extracted documents, leaving a gap in the additionality evidence chain
  • No monitoring report is present in the evidence set; the only ERR figure (96,308 tCO2e) appears to be the annual ex-ante estimate rather than a verified monitoring-period result
  • FPIC and grievance mechanism are not documented in the available record, creating uncertainty on social safeguards compliance

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available docum

Permanence

Wind avoidance project; no reversal events reported

Leakage

0% deduction; negligible justification appropriate for grid-

Baseline

Jurisdictional baseline; grid EF 0.9139 (2017); reassessed 2

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; dual-channel risk not excl

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents