Skip to main content
CDMWindChinaACM0002

CGN Shagou Phase I Wind Power Project

CDM-7019 ↗

#1559of 1935 in Renewable energy#1007of 1084 in China#1351of 1459 in CDM (UNFCCC)#1184of 1287 in ACM0002

4.0/ 10
Integrity
3.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A CDM wind power project in China validated by CTI with a jurisdictional baseline and appropriate leakage treatment, but the extracted record contains a major ERR discrepancy (79,377 vs 555,639 tCO2e) between the PDD and validation report, no confirmed additionality test type, and a material finding that no issuance was requested during the first crediting period. The low extraction confidence and absence of monitoring data limit confidence in the project's actual performance.

Red Flags

  • ERR contradiction: the PDD states 555,639 tCO2e while the validation report states 79,377 tCO2e — a 7-fold discrepancy that undermines data reliability
  • Material finding: no issuance was requested during the first crediting period (CL 1), raising questions about actual project implementation
  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving a critical CDM requirement unverified in available data
  • Low extraction confidence across documents, with one evidence document listed as 'unknown'

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not confirmed in extracted data

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional, reassessed 2020

Safeguards

Mentioned but FPIC and grievance not confirmed

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents