Skip to main content
CDMWindChinaACM0002

CGN Xinjiang Tacheng Mayitasi Phase I Wind Farm Project

CDM-5800 ↗

#661of 1935 in Renewable energy#316of 1084 in China#453of 1459 in CDM (UNFCCC)#510of 1287 in ACM0002

5.5/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A CDM wind farm project in Xinjiang, China, validated by CTC in November 2020 under methodology ACM0002 v20.0, with a 7-year crediting period and a lifetime emission reduction estimate of 593,383 tCO₂e. The jurisdictional grid-based baseline is appropriate for the technology, and no material findings or corrective actions were reported. However, several key data points—including the specific additionality test type, monitoring period, and buffer pool details—were not found in the extracted record, limiting confidence in the full compliance picture.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, creating an evidence gap on a core CDM requirement
  • No monitoring period or monitoring report was identified in the available documents, preventing verification of actual performance against the PDD estimate
  • One of the four evidence documents is listed as 'unknown' type, reducing confidence in the documentation set

Credit Vintages

IssuedRetiredAvailable
2020
447,7460447,746
Total447,7460447,746

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Avoidance project; no reversal risk

Leakage

0% deemed negligible; appropriate for wind

Baseline

Jurisdictional grid baseline, reassessed 2020

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents