Chacayes Hydroelectric Project, Chile
#540of 1935 in Renewable energy#7of 31 in Chile#361of 1459 in CDM (UNFCCC)#409of 1287 in ACM0002
Audit Analysis
The Chacayes hydroelectric project in Chile is a structurally sound CDM avoidance project with VVB-confirmed additionality and a jurisdictional baseline, but the validation report identified multiple errors in the grid emission factor spreadsheet (GCV-to-NCV conversion, LCMR data, solar plant data) requiring eight corrective actions. The absence of monitoring reports, FNRB documentation, and safeguards detail (FPIC, grievance mechanism) limits confidence in the project's ongoing compliance and transparency.
Red Flags
- Eight corrective actions required in the validation report, including errors in the Chile Electricity System Emission Factor spreadsheet (GCV-to-NCV conversion, LCMR data mismatches, incorrect solar plant data, year errors)
- Contradiction in total ERR figures: the validation report states 234,271 tCO₂e while another document references 1,639,897 tCO₂e — likely annual vs. full-crediting-period, but the discrepancy is not explicitly reconciled in the available record
- No monitoring reports found in the extracted record despite the crediting period running from July 2019 to July 2026
- FPIC and grievance mechanism not documented in any available source
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 318,953 | 0 | 318,953 | |
| 2023 | 1,541,464 | 0 | 1,541,464 | |
| Total | 1,860,417 | 0 | 1,860,417 |
Risk Indicators
VVB-confirmed combined test
Hydro avoidance – no reversal risk
Negligible – no fuel-switching pathway
Jurisdictional but spreadsheet errors pending correction
Mentioned but FPIC and grievance mechanism undocumented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →