Skip to main content
CDMWindChinaACM0002

Changli Datan 48MW Wind Power Project

CDM-7213 ↗

#663of 1935 in Renewable energy#317of 1084 in China#456of 1459 in CDM (UNFCCC)#512of 1287 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A standard 48 MW onshore wind project under CDM methodology ACM0002 with a jurisdictional baseline and a reasonable 0% leakage deduction. The extracted record is limited to the validation report and PDD, leaving additionality test details, monitoring data, and several MRV parameters unconfirmed. No contradictions or material compliance issues were identified, but the absence of verification/monitoring reports and key transparency fields limits confidence in the full project lifecycle.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverified from available documents
  • No monitoring or verification reports are present in the extracted set despite the project being approximately five years into its seven-year crediting period (2020–2027)
  • FNRB value, usage rate (assumed and verified), and usage monitoring method are all absent from the record, limiting ability to assess over-crediting risk

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

Avoidance-type wind; no reversal events reported

Leakage

0% deemed negligible — appropriate for grid-connected wind

Baseline

Jurisdictional baseline, reassessed 2020

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents