Changwa 10 MW Small-scale Hydro Project
#1517of 1935 in Renewable energy#957of 1084 in China#1287of 1459 in CDM (UNFCCC)#514of 806 in AMS-I.D
Audit Analysis
The Changwa 10 MW small-scale hydro project in China uses a jurisdictional baseline and an investment additionality test, both of which are structurally sound for a grid-connected hydro project. However, the available record contains only validation-era documents with no monitoring reports or verified emission reduction data, and the extraction confidence on key documents is low, leaving significant evidence gaps. The claimed lifetime reductions of ~155,600 tCO₂e over seven years are internally consistent with the plant's capacity, but cannot be independently confirmed without verified monitoring data.
Red Flags
- No monitoring reports or verified ERR figures are present in the extracted record; the project's crediting period ended in 2022 yet no post-validation data is available
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and key fields could not be reliably extracted
- Additionality verification by the VVB is not confirmed in the available data despite an investment test being identified
- Crediting period dates are inconsistent between the validation report (2015-07-09 to 2022-07-08) and another source (2015-09-07 to 2022-08-07)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 52,778 | 0 | 52,778 | |
| 2012 | 25,500 | 0 | 25,500 | |
| 2013 | 29,459 | 0 | 29,459 | |
| Total | 107,737 | 0 | 107,737 |
Risk Indicators
Investment test identified but VVB verification not confirme
Avoidance project with low reversal risk
0% deduction, deemed negligible — appropriate for grid-conne
Jurisdictional baseline, grid EF 0.5571 (2014), reassessed 2
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both unstated — dual-channel risk unas
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →