Chiem Hoa Hydropower Project
#301of 1935 in Renewable energy#16of 80 in Vietnam#188of 1459 in CDM (UNFCCC)#222of 1287 in ACM0002
Audit Analysis
The Chiem Hoa Hydropower Project is a small-scale CDM hydro project with a VVB-verified combined additionality test and a jurisdictional grid baseline, delivering approximately 68% of its pro-rata expected emissions reductions over the first monitoring period. Three material findings (geographical inconsistency, outdated grid emission factor tool, and O&M cost discrepancies) were identified during validation but resolved without pending corrective actions. The project's conservative delivery profile and standard methodology provide reasonable claim safety, though the internal contradiction in claimed ERR figures and the absence of documented FPIC or grievance mechanisms temper confidence.
Red Flags
- Internal contradiction in the same monitoring report: total ERR claimed appears as both 353,330 and 428,820 tCO2e, creating uncertainty about the true lifetime estimate
- Geographical location inconsistency in the PDD (CAR1) raises questions about the accuracy of the project boundary description
- Outdated grid emission factor tool version was used in the baseline calculation (CAR2), potentially affecting the 0.5764 tCO2/MWh value from 2009
- No FPIC or grievance mechanism is documented in the extracted record, despite safeguards being mentioned
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified combined test
Avoidance project, no reversals
0% justified for hydro
Jurisdictional but outdated grid EF tool
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →