Chilatán Hydroelectric Project
#664of 1935 in Renewable energy#6of 47 in Mexico#457of 1459 in CDM (UNFCCC)#232of 806 in AMS-I.D
Audit Analysis
The Chilatán Hydroelectric Project is a small-scale CDM hydro avoidance project in Mexico with a jurisdictional baseline, combined additionality test, and reasonable leakage treatment. However, the available record contains only validation-stage documents with no monitoring or verification reports, leaving delivery unverified. A significant ERR figure discrepancy between the PDD and validation report is explainable (annual vs. lifetime basis) but reflects documentation inconsistency.
Red Flags
- No monitoring or verification reports found in the extracted record — actual credit delivery is unverified
- ERR figures differ by a factor of 7 between the PDD (181,867 tCO2e) and the validation report (25,981 tCO2e), though the ratio matches the 7-year crediting period
- CORSIA and CCP eligibility status not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 55,871 | 0 | 55,871 | |
| 2010 | 58,075 | 0 | 58,075 | |
| 2011 | 32,568 | 0 | 32,568 | |
| 2013 | 53,982 | 0 | 53,982 | |
| Total | 200,496 | 0 | 200,496 |
Risk Indicators
Combined test present; VVB confirmation not explicit in reco
Avoidance project; no inherent reversal risk
0% with 'deemed negligible' justification; appropriate for s
Jurisdictional baseline; grid EF 0.423 tCO2e/MWh (2012)
FPIC conducted; benefit sharing and safeguards documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →