The Hornitos Hydroelectric Project is a CDM-registered hydro avoidance project with a combined additionality test and a grid-emission-factor baseline, but the extracted record contains several material documentation findings and unresolved contradictions on baseline method and leakage treatment. The project delivered roughly 68% of its pro-rata ex-ante expectation for the monitored period, indicating conservative crediting, yet the absence of a verified ERR figure and unconfirmed VVB additionality sign-off limit confidence in the overall integrity picture.

Red Flags

  • Nine material findings in the monitoring report (2021) include missing annual CER estimates, missing equipment lifetime, and insufficient baseline revalidation discussion, though no corrective actions were formally required.
  • Baseline method is contradictory: the PDD (2015) describes a jurisdictional baseline while the monitoring report (2021) labels it project-specific, creating ambiguity about the actual reference case.
  • FPIC was not conducted and no grievance mechanism is documented, leaving a gap in social safeguards for a project operating in Chile.
  • The available monitoring report covers only 2015-07-09 to 2018-12-31, leaving approximately 3.5 years of the 7-year crediting period (ending 2022-07-08) without a corresponding monitoring document in the extracted record.

Credit Vintages

IssuedRetiredAvailable
2012
152,9050152,905
2013
403,0390403,039
2022
727,9570727,957
Total1,283,90101,283,901

Risk Indicators

Additionality

Combined test present; VVB sign-off not confirmed in record

Permanence

Hydro avoidance; no reversal events or risk

Leakage

0% deduction; PDD says negligible, monitoring report says no

Baseline

Grid-EF based; method label contradictory across documents

Safeguards

Safeguards mentioned and benefit sharing described; FPIC not

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AM0026

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.