Chile: Quilleco Hydroelectric Project

CDM-1265 ↗

#1094of 1935 in Renewable energy#15of 31 in Chile#824of 1459 in CDM (UNFCCC)

5.0/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
6.0
Documentation
4.0

Audit Analysis

The Quilleco Hydroelectric Project is a CDM small-scale hydro project with a confirmed additionality test and inherent permanence advantages, but its credibility is undermined by nine material findings in the monitoring report, unresolved contradictions in baseline methodology and leakage treatment across documents, and the absence of a verified ERR figure for the reporting period. The project delivered roughly 62% of the pro-rata ex-ante expectation for the elapsed monitoring window, which is conservative but reflects weak monitoring rigor.

Red Flags

  • Nine material findings in the 2021 monitoring report, including missing annual CERs estimates, weak generation cross-checks, and unclear baseline revalidation steps, yet no corrective actions were required
  • Baseline method is stated as 'jurisdictional' in the PDD (2022) but 'project' in the 2021 monitoring report — an unresolved contradiction that affects the validity of the emission-factor basis
  • No verified ERR figure is available for the 2016–2018 monitoring period; only the PDD's lifetime ex-ante estimate (2,078,174 tCO₂e) is on record
  • Grid emission factor of 0.70351 tCO₂/MWh is dated 2013 and may not reflect current Chilean grid conditions
  • Monitoring period (2016–2018) covers only about 43% of the seven-year crediting period (2015–2022), leaving a large unmonitored window

Credit Vintages

IssuedRetiredAvailable
2013
744,8200744,820
2015
425,5200425,520
2016
326,5550326,555
2023
572,5090572,509
Total2,069,40402,069,404

Risk Indicators

Additionality

Combined test, VVB-confirmed (2022)

Permanence

Hydro – no reversal risk, no events reported

Leakage

0% deduction, 'deemed negligible' but contradicts earlier 'q

Baseline

Jurisdictional per PDD but contradicted by monitoring report

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27AM0026

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents