China Chuandongxia Small Hydropower Project
#1009of 1935 in Renewable energy#552of 1084 in China#742of 1459 in CDM (UNFCCC)#326of 806 in AMS-I.D
Audit Analysis
A small hydropower CDM project in China with a standard grid-emission-factor baseline and a well-known VVB (TÜV NORD CERT). The project delivered roughly 68% of its pro-rata expected emissions reductions for the elapsed monitoring period, which is conservative. However, the additionality test type is not explicitly documented, no buffer pool is in place, and three contradictions between the PDD and the monitoring report (leakage treatment, baseline method, and ERR figures) reduce confidence in data consistency.
Red Flags
- Additionality test type and VVB confirmation are not stated in any available document, leaving the additionality claim unverified in the extracted record
- No buffer pool percentage is recorded, and no reversal events data is available, leaving permanence risk unquantified despite the low inherent risk of a hydropower asset
- Three contradictions between the PDD (2016) and the monitoring report (2024) on leakage treatment, baseline method, and total ERR figures indicate inconsistent reporting across the project's documentation
- Seven material findings were raised during verification, including inconsistent grid emission factor data sources and missing monitoring parameters, all of which required corrective action
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 30,829 | 0 | 30,829 | |
| Total | 30,829 | 0 | 30,829 |
Risk Indicators
Test type not stated; VVB confirmation not found in record
mixed evidence / unresolved risk
0% deduction; PDD says 'deemed negligible' but monitoring re
Grid EF baseline (0.598375) but method label contradicts bet
Safeguards mentioned and benefit sharing described, but FPIC
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →