China Jintan Hydropower Project
#132of 1935 in Renewable energy#34of 1084 in China#78of 1459 in CDM (UNFCCC)#94of 1287 in ACM0002
Audit Analysis
The China Jintan Hydropower Project is a small-scale CDM hydro avoidance project with VVB-confirmed additionality and a jurisdictional baseline, presenting moderate integrity. However, several key verification fields (verified ERR, FNRB, usage monitoring, CORSIA/CCP status) are absent from the extracted record, and the grid emission factor dates to 2006, limiting confidence in the precision of claimed reductions.
Red Flags
- Grid emission factor of 0.95116 tCO2/MWh is from 2006 and no updated value or reassessment date is found in the available documents
- Total ERR verified figure is not stated in the extracted record, preventing independent cross-check of the 41,790 tCO2e claimed in the 2012 monitoring report
- CORSIA eligibility and CCP status are both not stated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 24,078 | 0 | 24,078 | |
| 2011 | 27,769 | 0 | 27,769 | |
| 2012 | 19,956 | 0 | 19,956 | |
| 2013 | 41,790 | 0 | 41,790 | |
| Total | 113,593 | 0 | 113,593 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, deemed negligible
Jurisdictional, grid EF from 2006
Mentioned, benefit sharing described, FPIC not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →