China Resources Penglai Daxindian Wind Power Project Phase I
#209of 1935 in Renewable energy#69of 1084 in China#125of 1459 in CDM (UNFCCC)#148of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The project is fundamentally sound in design, but a significant discrepancy between the ex-ante estimate in the validation report (88,861 tCO₂e over the full crediting period) and the monitoring-period figure (147,634 tCO₂e over ~18 months) raises over-crediting concerns. Several operational and MRV fields remain unreported in the extracted record.
Red Flags
- The monitoring report (2013) reports 147,634 tCO₂e for an ~18-month period, while the validation report (2012) states an ex-ante estimate of only 88,861 tCO₂e for the full 7-year crediting period — the monitoring figure is roughly 7.7× the pro-rata expectation, indicating either a very conservative initial estimate or a data inconsistency.
- Total verified ERR is not stated in the extracted record; only the claimed figure from the monitoring report is available, preventing independent cross-check.
- Buffer pool percentage and reversal-event history are not stated in any available document, leaving permanence safeguards unconfirmed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% with negligible justification (wind)
Jurisdictional grid EF, standard method
Mentioned, benefit sharing described; FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →