Skip to main content
CDMWindChinaACM0002

China Resources Penglai Daxindian Wind Power Project Phase I

CDM-5671 ↗

#209of 1935 in Renewable energy#69of 1084 in China#125of 1459 in CDM (UNFCCC)#148of 1287 in ACM0002

6.3/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
5.5
Documentation
6.5

Audit Analysis

A CDM wind power project in China with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The project is fundamentally sound in design, but a significant discrepancy between the ex-ante estimate in the validation report (88,861 tCO₂e over the full crediting period) and the monitoring-period figure (147,634 tCO₂e over ~18 months) raises over-crediting concerns. Several operational and MRV fields remain unreported in the extracted record.

Red Flags

  • The monitoring report (2013) reports 147,634 tCO₂e for an ~18-month period, while the validation report (2012) states an ex-ante estimate of only 88,861 tCO₂e for the full 7-year crediting period — the monitoring figure is roughly 7.7× the pro-rata expectation, indicating either a very conservative initial estimate or a data inconsistency.
  • Total verified ERR is not stated in the extracted record; only the claimed figure from the monitoring report is available, preventing independent cross-check.
  • Buffer pool percentage and reversal-event history are not stated in any available document, leaving permanence safeguards unconfirmed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% with negligible justification (wind)

Baseline

Jurisdictional grid EF, standard method

Safeguards

Mentioned, benefit sharing described; FPIC/grievance not sta

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents