China Shangbao Small Hydropower Project
#835of 1935 in Renewable energy#425of 1084 in China#585of 1459 in CDM (UNFCCC)#284of 806 in AMS-I.D
Audit Analysis
The China Shangbao Small Hydropower Project is a CDM-registered hydro avoidance project validated by Applus+ Certification, using a jurisdictional baseline (reassessed 2022) and the AMS-I.D methodology. The project presents a low permanence risk profile typical of hydro, with no reversal events and a reasonable 0% leakage deduction. However, the extracted record lacks specific additionality test details, FNRB values, and any monitoring-period data, limiting the depth of assurance available.
Red Flags
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, creating an evidence gap on a core CDM requirement
- No monitoring reports or verification reports are present in the evidence set; only the validation report (2022) and PDD are available, so post-registration performance cannot be assessed
- FNRB value and usage monitoring method are not stated, leaving the emission-factor and consumption assumptions unverified against actuals
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 54,441 | 0 | 54,441 | |
| 2011 | 48,354 | 0 | 48,354 | |
| 2012 | 56,748 | 0 | 56,748 | |
| 2017 | 134,023 | 0 | 134,023 | |
| Total | 293,566 | 0 | 293,566 |
Risk Indicators
Test type not stated; VVB validation implies assessment but
Hydro avoidance project; no reversal events; low inherent ri
Deemed negligible; 0% deduction reasonable for hydro
Jurisdictional baseline; reassessed 2022; grid EF specified
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated; dual-channel risk unassess
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →