Audit Analysis
A small-scale CDM hydro project in China with a jurisdictional grid baseline, VVB-confirmed additionality, and a full-period monitoring report showing verified emissions reductions matching the claimed figure exactly. The main concerns are a minor contradiction in how leakage is justified across documents and the absence of detailed safeguards documentation (FPIC, grievance mechanism). Overall a straightforward, low-risk generation project with moderate documentation depth.
Red Flags
- Leakage justification is contradictory: the monitoring report (Aug 2019) states leakage was 'quantified' while the validation report (Aug 2019) describes it as 'deemed negligible' — both arrive at 0% deduction but the methodological basis is inconsistent
- Safeguards are mentioned in the project documents but neither FPIC nor a grievance mechanism is documented in the extracted record
- Additionality test type is not specified in the available documents despite VVB confirmation
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed (CCCI)
Hydro generation – low reversal risk
0% deduction; contradictory justification across docs
Jurisdictional grid EF, reassessed 2019
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →