Chongqing Wanzhou Xiangjiazui Hydropower Station
#1484of 1935 in Renewable energy#921of 1084 in China#1234of 1459 in CDM (UNFCCC)#500of 806 in AMS-I.D
Audit Analysis
A small CDM-registered hydropower project in China using a standard jurisdictional grid-emission-factor baseline and the AMS-I.D. methodology. The project design is sound for its type, but the extracted record is thin: no monitoring or verification data, no explicit additionality test description, and low extraction confidence limit confidence in the overall assessment.
Red Flags
- No monitoring or verification reports found in the extracted record; the 129,577 tCO2 lifetime claim cannot be cross-checked against actual generation data
- Additionality test type and VVB confirmation are not stated in the available documents, leaving the additionality assessment unverified in the extracted record
- Low extraction confidence across the document set, with one of four source documents listed as 'unknown', reducing reliability of the extracted facts
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 37,040 | 0 | 37,040 | |
| Total | 37,040 | 0 | 37,040 |
Risk Indicators
Test not explicitly stated in extracted record
Hydro asset; no reversal events reported
0% deduction; deemed negligible (appropriate for hydro)
Jurisdictional grid-EF baseline (2015 China)
Safeguards and benefit-sharing mentioned; FPIC/grievance not
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →