Skip to main content
CDMHydroVietnamACM0002

Chu Linh and Coc San Hydropower Project

CDM-7338 ↗

#1162of 1935 in Renewable energy#55of 80 in Vietnam#884of 1459 in CDM (UNFCCC)#908of 1287 in ACM0002

4.9/ 10
Integrity
6.0
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM hydropower project in Vietnam with a VVB-confirmed investment additionality test and a jurisdictional baseline, but severely limited by the absence of any monitoring or verification data, a large unexplained discrepancy in claimed emission reductions between the PDD and validation report, and low document extraction confidence. The project's inherent low reversal risk as a hydro avoidance project is a positive, but the data gaps and contradictions prevent a higher assessment.

Red Flags

  • Claimed emission reductions differ by a factor of ~7 between the PDD (591,549 tCO₂e) and the validation report (84,507 tCO₂e), with no explanation provided in the extracted record
  • No monitoring reports, verified ERR figures, or monitoring period data were found in any available document
  • Grid emission factor is from 2008 and no updated or reassessed baseline value is documented
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Hydro avoidance – low inherent reversal risk

Leakage

0% deemed negligible – consistent for grid displacement

Baseline

Jurisdictional but grid EF from 2008, no reassessment docume

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents