Skip to main content
CDMHydroIndiaACM0002

Chutak Hydroelectric Project

CDM-2025 ↗

#86of 1935 in Renewable energy#48of 975 in India#51of 1459 in CDM (UNFCCC)#57of 1287 in ACM0002

6.7/ 10
Integrity
7.0
Transparency
6.0
Claim Safety
6.5
Documentation
7.5

Audit Analysis

The Chutak Hydroelectric Project is a small-scale CDM hydro project in India with a solid additionality assessment (combined test, VVB-confirmed) and a standard jurisdictional grid baseline. However, the project delivered only 14–33% of its pro-rata ex-ante emission reduction expectation during the monitored period, and a discrepancy between the PDD and monitoring report on verified reductions raises data-reliability questions. No reversals, no corrective actions, and a reasonable leakage treatment support moderate confidence in the credits issued.

Red Flags

  • Verified reductions (69,862 tCO2e per the monitoring report) represent only ~14% of the pro-rata expectation (~498,878 tCO2e) derived from the PDD's lifetime estimate of 1,167,819 tCO2e over 7 years, indicating the ex-ante projection was substantially optimistic for the monitored period.
  • A contradiction exists between the PDD (1,167,819 tCO2e) and the monitoring report (69,862 tCO2e) on total ERR figures; the merged record also carries a third value of 166,831 tCO2e of unclear provenance, creating ambiguity about the true verified reduction for the period.
  • The grid emission factor of 0.793 tCO2/MWh is drawn from 2006 data, which is six years before the crediting period began in 2012; no updated or sensitivity-checked factor is documented.

Credit Vintages

IssuedRetiredAvailable
2021
59,811059,811
Total59,811059,811

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversals

Leakage

0% deemed negligible, reasonable for hydro

Baseline

Jurisdictional grid EF from 2006, dated

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents