Clean Electricity Generation by Solar Power Project in Rajasthan
GS-2605 ↗ · current registry ID: GS7760
#1163of 1935 in Renewable energy#602of 975 in India#921of 1801 in Gold Standard (GS)#909of 1287 in ACM0002
Audit Analysis
A Gold Standard solar electricity project in Rajasthan with VVB-confirmed additionality and inherently low permanence risk, but undermined by an open finding showing plant load factor 18% above the ex-ante estimate, multiple contradictory ERR figures across monitoring reports, and a project-specific baseline. The low extraction confidence and eight corrective action requests further erode confidence in the data quality.
Red Flags
- Open finding (No. 07): verified PLF of 27.37% is 18.23% higher than the estimated 23.15%, with no satisfactory explanation provided — a direct over-crediting risk
- Contradictory ERR figures across monitoring reports: claimed ERR of 1,876,194 (May 2025) vs 5,058,860 (Apr 2025); verified ERR of 373,076 (Jul 2021) vs 1,292,413 (undated)
- Eight corrective action requests raised during verification, with Finding No. 07 still open at the time of the 2025-06-04 verification report
- Low extraction confidence in the document set, meaning key parameters (fnrb_method, usage monitoring, CORSIA/CCP status) could not be reliably confirmed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 11,329 | 0 | 11,329 | |
| 2021 | 704,830 | 5,599 | 699,231 | |
| 2022 | 1,255,386 | 120,986 | 1,134,400 | |
| 2023 | 1,279,235 | 0 | 1,279,235 | |
| 2024 | 290,903 | 37,874 | 253,029 | |
| Total | 3,541,683 | 164,459 | 3,377,224 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justified for grid displacement
Project-specific baseline, not jurisdictional
FPIC, grievance mechanism, benefit sharing documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →