Clean Energy Generation in Gujarat, India
#708of 975 in India#1053of 1459 in CDM (UNFCCC)#429of 806 in AMS-I.D
Audit Analysis
A CDM wind project in Gujarat with a VVB-confirmed investment additionality test and a standard jurisdictional grid baseline, but the validation process surfaced 13 corrective action requests and 8 comments, several of which questioned the transparency of the investment analysis and baseline calculations. No monitoring-period data or verified emission reductions are available in the extracted record, and the overall extraction confidence is low, limiting the ability to confirm actual performance against the 234,360 tCO₂e lifetime claim.
Red Flags
- 13 corrective action requests (CARs) raised during validation, including CAR 7 (PDD did not follow the latest Additionality Tool), CAR 8 (benchmark and investment analysis transparency questioned), CAR 10 (baseline emission calculation and grid EF derivation not transparent), and CAR 11 (ex-ante reduction calculation not transparently presented)
- No monitoring-period data or verified emission-reduction figure is available in the extracted record, so actual performance against the 234,360 tCO₂e claim cannot be confirmed
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the structured data may be incomplete
- Contradiction on leakage treatment: the validation report (Oct 2012) states leakage was 'deemed negligible' while an earlier appendix (Mar 2011) describes it as 'quantified'
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but CARs questioned investment analysis
Wind avoidance – no reversal risk
0 % deemed negligible; minor doc contradiction
Jurisdictional grid but CARs flagged calculation transparenc
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →