Clean Energy Project at Karnataka
#125of 975 in India#152of 1459 in CDM (UNFCCC)#94of 806 in AMS-I.D
Audit Analysis
A CDM wind energy project in Karnataka, India, with a jurisdictional baseline and VVB-confirmed investment additionality test. The project delivered roughly 80% of its pro-rata expected emissions reductions in the first monitoring year, which is reasonable for wind variability. However, eight material findings in the validation report, the absence of documented FPIC or a grievance mechanism, and a minor leakage-justification contradiction between documents temper the overall assessment.
Red Flags
- Eight material findings (CARs) in the validation report covering host-country approval, grid-name inconsistency, debundling justification, baseline data source, IRR input values, and monitoring procedure — all resolved before registration but indicating a weak initial submission
- No Free, Prior and Informed Consent (FPIC) or grievance mechanism documented in any available record, despite safeguards being mentioned
- Leakage justification is inconsistent: the monitoring report states 'deemed negligible' while an appendix references a 'quantified' treatment, creating ambiguity about whether leakage was actually calculated
- No buffer pool, permanence mechanism, or reversal-risk mitigation documented for this 10-year CDM crediting period
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 6,092 | 0 | 6,092 | |
| Total | 6,092 | 0 | 6,092 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, reasonable for grid-connected wind
Jurisdictional grid EF (0.93, 2007)
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.