Skip to main content
GSOtherGermanyGeneral Methodologyv2.0

CO2 Sequestration at a German Concrete Recycler using the Neustark Technology

GS-4409 ↗ · current registry ID: GS12327

#5of 5 in Germany#389of 426 in Gold Standard (GS)

4.1/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.0
Documentation
3.5

Audit Analysis

This Gold Standard project sequesters CO₂ through accelerated carbonation of concrete aggregate at a German recycler, using a novel methodology (v1.0). While additionality is VVB-confirmed and leakage is quantified, the absence of a buffer pool for a sequestration project, a very short crediting period (~7 months), multiple open corrective actions, and significant contradictions across monitoring reports undermine confidence in the integrity and permanence of the claimed credits.

Red Flags

  • No buffer pool percentage stated for a carbon sequestration project, leaving permanence risk unmitigated
  • Crediting period spans only ~7 months (2023-03-28 to 2023-11-09) while the monitoring period (2024-03-01 to 2024-12-31) falls entirely after the crediting period ended
  • Two corrective actions (CL 06 and CAR 02) remain open at the time of the verification report (2025-07-31)
  • Seven contradictions identified across documents, including conflicting ERR figures, grid emission factors, and crediting period dates
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable

Credit Vintages Exhausted

IssuedRetiredAvailable
2023
62620
2024
4844840
Total5465460

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool; reversal risk only qualitatively assessed

Leakage

Quantified but no specific deduction stated

Baseline

Project-specific; no reassessment date found

Safeguards

FPIC conducted; grievance mechanism present

Double-claim

CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents