Community Based Forest Plantation in India
#57of 261 in Soil carbon#426of 975 in India#522of 1339 in Verra (VCS)#22of 97 in AR-ACM0003
Audit Analysis
A VCS forest plantation project in India with VVB-verified additionality, a 20% buffer pool, and no reported reversals, but undermined by a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' and a validation process that required 45 corrective actions. The project delivered roughly 19% of its pro-rata ex-ante expectation for the elapsed monitoring period, which protects against over-crediting but raises questions about baseline calibration.
Red Flags
- 45 corrective actions were raised during validation, including insufficient demonstration of baseline scenario and additionality for each state, and insufficient justification of non-permanence risks
- Leakage deduction of 0% justified solely as 'deemed negligible' without quantified analysis, in a multi-state forest plantation project where displacement of biomass is plausible
- Ex-ante lifetime estimate dropped from 857,591 (PDD) to 686,073 (validation report), a ~20% reduction, likely reflecting boundary restrictions imposed as a corrective action
- Project delivered only ~19% of the pro-rata ex-ante expectation for the 6.3-year monitoring period (27,566 verified vs ~144,000 expected), suggesting the original baseline may have been overly optimistic
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified combined test
20% buffer, no reversals
0% deduction, weak justification
Project-specific, not yet due for reassessment
FPIC, grievance mechanism, benefit sharing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →