Community Carbon Safe Water Drinking Programme-VPA2
GS-2927 ↗ · current registry ID: GS10968
#431of 1329 in Industrial#48of 163 in Uganda#685of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard safe drinking water project in Uganda has VVB-verified additionality and a recently reassessed baseline, but is undermined by a high volume of inter-document contradictions (15 identified), four open corrective actions, no stated buffer pool, and inconsistent leakage treatment. The project over-delivered relative to its pro-rata expectation (~146%), which is reassuring, yet the FNRB and grid emission factor discrepancies raise material questions about the accuracy of the underlying credit calculations.
Red Flags
- FNRB value contradicts between the 2025 verification report (0.89) and the 2025 PDD (0.39) — a factor-of-2.3 discrepancy that directly affects credit volume
- Grid emission factor differs by a factor of ~115 between the 2025 monitoring report (0.001) and the 2023 verification report (0.1158), with no unit clarification
- Four corrective actions remain open in the latest verification report (2025-12-26), including substantiation of monitored value estimation basis
- Leakage justification is inconsistent: 'deemed negligible' in the 2024 verification report but 'not addressed' in the 2025 verification report, with a 0% deduction throughout
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1,037 | 1,037 | 0 | |
| 2022 | 8,354 | 8,070 | 284 | |
| 2023 | 45,128 | 0 | 45,128 | |
| 2024 | 55,175 | 0 | 55,175 | |
| Total | 109,694 | 9,107 | 100,587 |
Risk Indicators
VVB-confirmed combined test
reversals not addressed
0% deduction, justification inconsistent
Project-specific, reassessed 2025
Grievance & benefit-sharing present; FPIC contradictory
CORSIA-eligible; CCP status contradictory
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →