Composting Project in Santa Catarina

VCS-1144 ↗

4.2 / 10
Integrity
4.8
Transparency
4.1
Claim Safety
3.9
Documentation
3.2

Score Breakdown

Integrity

verified The verification report confirms additionality through a barrier test and says the VVB, Earthood Services Private Limited, verified it.

missing Leakage is not addressed in the verification record, buffer pool coverage is not stated, and the report lists several corrective actions and missing source evidence.

Transparency

verified The project has a named VVB and a defined monitoring period from 2019-05-01 to 2020-12-31, with claimed and verified ERs both reported as 4,100 in the latest record.

missing Low extraction confidence and missing monitoring details such as usage monitoring method, baseline reassessment timing, and public safeguard documentation limit traceability.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of dual-claim exposure.

missing The baseline is project-specific rather than jurisdictional, leakage is not justified, and contradictions show earlier higher ER figures of 28,564 claimed and 29,826 verified.

Documentation

verified The record includes a substantial number of extracted documents and a recent verification report dated 2024-12-23.

missing Extraction confidence is low, evidence_docs is not identified beyond an unknown entry, and the verification report itself notes missing licenses, spreadsheets, and social carbon evidence.

Detailed Analysis

Integrity

The verification report dated 2024-12-23 confirms additionality through a barrier test and states that Earthood Services Private Limited verified it, which supports the project’s core crediting logic. However, leakage is explicitly not addressed, the buffer pool is not stated, and the report lists several corrective actions, including missing licenses and calculation support files, which weakens confidence in the emissions accounting. No reversal events are reported, which is positive for permanence in an avoidance-style waste project.

Transparency

The project has a named verifier and a clear monitoring period, and the latest verification record reports 4,100 claimed and 4,100 verified ERs. Still, key transparency fields are missing or not stated in available documents, including the usage monitoring method, baseline reassessment timing, and buffer pool coverage. Low extraction confidence further reduces trust in the completeness of the documentation trail.

Claim Safety

Claim safety is constrained by the project-specific baseline, the absence of a leakage justification, and the lack of quantified usage or monitoring details. The project is marked as not CORSIA-eligible, which helps reduce dual-market risk, but the record does not provide CCP approval status. Earlier documents in the contradictions list show much larger ER figures, so the reliability of the credited volume is weaker than the latest record alone suggests.

Documentation

The record draws on many extracted documents and includes a recent verification report, which is a positive sign for recency. However, the extraction confidence is low, and the verification report itself says several evidences were not provided to the verification team, including licenses, daily farmer reports, support spreadsheets, integrator spreadsheets, and social carbon evidence. That combination indicates a materially incomplete documentation package.

Overall

I privileged the 2024-12-23 verification report for the latest values because it is the most recent and appears to be the highest-priority assurance document, but I discounted confidence because the contradictions show materially different earlier values for additionality, leakage treatment, safeguards, and ER totals. In particular, I treated the latest report’s statements as controlling where they are explicit, while lowering scores because the record does not resolve why earlier documents reported different ER volumes and safeguard status. The project is not weak enough to trigger the integrity gate, but the unresolved contradictions and missing evidence keep the overall assessment in the low-to-mid range.

Audit Analysis

The project has some positive integrity signals, including VVB-confirmed additionality and no reported reversal events, but the evidence base is weakened by missing leakage treatment, no buffer pool information, and several unresolved verification findings. Transparency and documentation are limited by low extraction confidence, missing monitoring details, and contradictions across documents on key items such as additionality, leakage, safeguards, and credited volume.

Project Description

Proponent: Multiple Proponents Protocol categories: Waste handling and disposal Protocols: AMS-III.D.; AMS-III.F. Estimated annual GHG reductions: 18077 tCO2e Region: Registration date: 2020-04-06

Red Flags

  • Leakage is marked as not addressed in the verification record, with no quantified deduction beyond 0%.
  • The verification report lists multiple corrective actions and missing evidence, including licenses, farmer logs, support spreadsheets, and social carbon evidence.
  • Contradictions show large shifts in claimed and verified ERs versus earlier documents, reducing reliability.

Credit Vintages

Issued Retired Available
2011
3,635 3,635 0
2012
8,839 8,839 0
2013
9,143 9,143 0
2014
11,412 11,412 0
2015
11,207 11,207 0
2016
7,306 7,306 0
2017
15,044 12,190 2,854
2018
3,449 3,204 245
2019
829 415 414
2020
416 416 0
Total 71,280 67,767 3,513

Cosa migliorerebbe questo punteggio

  • Provide a complete leakage assessment with a clear justification or quantified deduction, plus the underlying calculations and assumptions.
  • Publish the missing monitoring evidence, safeguard documentation, and a reconciliation note explaining the contradictions in ER totals and safeguard status across documents.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed barrier test

Permanence

No reversals reported

Leakage

Leakage not addressed

Baseline

Project baseline, reassessment missing

Safeguards

No safeguards documented

Double-claim

Not CORSIA-eligible; CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti