Cookstove Distribution by Infosys in Meghalaya
GS-3994 ↗ · current registry ID: GS11947
#350of 1329 in Industrial#473of 975 in India#568of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove distribution project in Meghalaya with a VVB-confirmed investment additionality test and standard safeguards, but undermined by a critical contradiction in the leakage deduction (95% vs 5% across documents), unaddressed reversal risk for distributed cookstoves, and a project-specific baseline with no documented reassessment. The low extraction confidence and multiple unit-representation inconsistencies in the record further erode confidence in the underlying data.
Red Flags
- Leakage deduction contradicts itself across documents: the 2023 verification report states 95% while the 2025 monitoring report states 5% — a 90-percentage-point discrepancy that, if unresolved, could invalidate the credit volume
- Reversal events are explicitly 'not addressed' in the verification report and no buffer pool percentage is stated, leaving the cookstove project exposed to cookstove loss, damage, or replacement with less-efficient alternatives
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, which undermines confidence in all extracted figures
- Baseline last reassessed date is not found in any available document, and the baseline is project-specific rather than jurisdictional
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 16,728 | 16,728 | 0 | |
| 2023 | 31,009 | 0 | 31,009 | |
| 2024 | 27,219 | 0 | 27,219 | |
| Total | 74,956 | 16,728 | 58,228 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
95% vs 5% contradiction across documents
Project-specific, reassessment date not found
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →