CrisToro - Lebu Wind Project
#758of 1935 in Renewable energy#10of 31 in Chile#530of 1459 in CDM (UNFCCC)#263of 806 in AMS-I.D
Audit Analysis
The CrisToro Lebu Wind Project is a CDM-registered wind energy project in Chile with a VVB-confirmed barrier additionality test and a jurisdictional baseline, which are solid foundations. However, the available record is limited to a 2010 validation report with low extraction confidence, no monitoring report, and several key MRV parameters (FNRB, usage rates, monitoring period) are absent. The project's inherent low reversal risk as a wind installation is a positive, but the documentation gaps and a leakage-justification contradiction temper confidence in the overall credit quality.
Red Flags
- Min extraction confidence is low, indicating at least one key document was poorly readable, undermining reliability of the extracted record
- No monitoring report or monitoring period is present in the available documents; the only primary document is the 2010 validation report
- Contradiction on leakage justification: the validation report states 'deemed negligible' while another source references a 'quantified' approach
- Ten Corrective Action Requests were raised during validation (all closed), including redefinition of the project start date and removal of a regulatory risk barrier from the PDD
- Grid emission factor is from 2007 and no updated or reassessed baseline is documented
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed barrier test
Wind project, low inherent reversal risk
0% deduction, justification contradicted by another source
Jurisdictional grid EF (0.662, 2007)
FPIC conducted, safeguards mentioned, grievance mechanism no
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →