Crow Lake Wind Emissions Reduction Project
#30of 115 in United States#510of 629 in Verra (VCS)#314of 383 in ACM0002
Audit Analysis
The Crow Lake Wind project is a registered VCS wind energy project with VVB-confirmed additionality and no reversal risk, but it is undermined by a 22% Build Margin calculation error, a grid emission factor discrepancy of over 2× between the PDD and monitoring report, a 0% leakage deduction with no stated justification, and 14 outstanding corrective actions. The project's inherent low-risk profile as a renewable energy displacement activity is partially offset by significant documentation and MRV quality concerns.
Red Flags
- 22% discrepancy in Build Margin calculations for Wisconsin Power & Light Co. (Plant Code 64020) identified in corrective actions, potentially overstating baseline emissions
- Grid emission factor contradiction: PDD (2023) states 0.373 tCO₂/MWh while the monitoring report (2022) states 0.8422 tCO₂/MWh — a 2.3× difference that materially affects credit volume
- Leakage deduction of 0% with justification recorded as 'not addressed' in the 2023 verification report, despite the 2015 verification having recorded a quantified justification
- Monitoring period gap of 2015–2017 flagged as a material finding, with no explanation provided for the missing years
- Verification conducted against VCS Standard v3.7 instead of the required v4.0, and the VVB cited the wrong methodology version (9.0 instead of 12.1.0)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 414,075 | 414,075 | 0 | |
| 2012 | 527,093 | 527,093 | 0 | |
| 2013 | 509,524 | 509,524 | 0 | |
| 2014 | 574,396 | 574,396 | 0 | |
| 2018 | 468,824 | 313,833 | 154,991 | |
| 2019 | 444,562 | 421,889 | 22,673 | |
| 2020 | 162,110 | 156,893 | 5,217 | |
| 2021 | 157,712 | 87,158 | 70,554 | |
| Total | 3,258,296 | 3,004,861 | 253,435 |
Risk Indicators
VVB-confirmed investment test
Wind displacement — no reversal risk
0% deduction, justification not addressed
Project-specific, reassessed 2023, EF contradiction
Mentioned but FPIC and grievance inconsistent
CORSIA-ineligible, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →