Skip to main content
CDMWindChinaACM0002

CWI Shangyi Shijing Wind Farm Phase I Project

CDM-4742 ↗

#604of 1935 in Renewable energy#282of 1084 in China#410of 1459 in CDM (UNFCCC)#463of 1287 in ACM0002

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
4.5
Documentation
7.0

Audit Analysis

A CDM Phase 1 wind farm in China with VVB-confirmed additionality and inherently low permanence risk, but the verified emissions reductions for the first monitoring period (638,631 tCO₂) are roughly 6× the ex-ante expectation for that period, raising significant over-crediting concerns. Three contradictions between the validation and monitoring reports (baseline method, leakage treatment, and ERR figures) further erode confidence in the data. Documentation is adequate with high extraction confidence, though four minor corrective actions related to time-period errors were required.

Red Flags

  • Verified ERR of 638,631 tCO₂ for the 1.5-year monitoring period is approximately 635% of the monitoring report's own ex-ante estimate of 100,563 tCO₂ for the same period, indicating extreme over-delivery or a data error
  • Baseline method is described as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction that affects baseline credibility
  • Leakage treatment is inconsistent: the validation report deems it negligible while the monitoring report does not address it at all
  • Grid emission factor of 0.84045 is from 2017, applied to a 2019–2020 monitoring period without documented update

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed under ACM0002

Permanence

Wind – no reversal risk

Leakage

Contradictory treatment across reports

Baseline

Method contradiction; 2017 grid EF

Safeguards

Mentioned but details sparse

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents