Düzova Wind Power Project, Turkey
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB using an investment test, and the project uses ACM0002 with a project baseline.
missing Reversal treatment is not clearly settled in the extracted record, and the monitoring report shows open forward action requests.
Transparency
verified The monitoring period is stated for 2024, and the verification report identifies RE Carbon Ltd. as the VVB.
missing Total verified versus claimed emission reductions are not found in the extracted record, and the extraction confidence is low.
Claim Safety
verified Leakage is described as negligible with a 0% deduction, which is favorable for over-crediting risk.
missing The project is marked CORSIA-eligible, while CCP status is not mentioned, so dual-claim risk is not fully resolved.
Documentation
verified Multiple official documents appear to have been used, including monitoring and verification material, and safeguards such as FPIC and a grievance mechanism are mentioned.
missing The extraction confidence is low, and several key fields are missing or only partially specified, including buffer pool treatment and usage monitoring.
Detailed Analysis
Integrity
The project has a relatively solid starting point because the verification report confirms additionality through an investment test, and the baseline method is project-based under ACM0002. Leakage is presented as negligible with a 0% deduction, but the record does not clearly show buffer pool treatment, and reversal handling is inconsistent across the extracted material. Open forward action requests in the monitoring report also suggest some unresolved implementation issues.
Transparency
The monitoring period is clearly stated, and the VVB is named as RE Carbon Ltd., which helps traceability. But the extracted record does not provide total claimed or verified emission reductions, and usage monitoring details are not stated. The low extraction confidence further reduces confidence that the documentation is complete and fully readable.
Claim Safety
Claim safety is helped by the project type and the stated negligible leakage treatment, which lowers the risk of inflated credits. However, the project is marked CORSIA-eligible, while CCP status is not mentioned, so the dual-market claim picture is incomplete. The absence of verified usage-rate information also leaves some residual over-crediting uncertainty.
Documentation
The record includes a substantial set of extracted facts, and it does mention FPIC, a grievance mechanism, and multiple verification findings. Still, the extraction confidence is low, several key fields are missing, and the monitoring report lists open FARs that were not yet closed. The crediting-period contradiction also indicates that the documentation trail is not fully clean or internally consistent.
Overall
I privileged the newer monitoring-report values where they appeared more recent and specific, such as the 2025 leakage characterization and the 2023-2025 crediting period, but the contradictions themselves materially reduce confidence. In particular, the record conflicts on leakage treatment, reversal events, and crediting period, so I scored downward for reliability even though the project has a VVB-confirmed additionality case. The low extraction confidence and open action items further justify a mid-range overall score.
Audit Analysis
This is a wind project with a VVB-confirmed investment-test additionality case and a project baseline under ACM0002, which supports moderate integrity. However, the record has several open or unresolved issues, including open forward action requests, low extraction confidence, and contradictions around leakage, reversal events, and the crediting period that reduce reliability.
Project Description
Developer: Fiba Yenilenebilir Enerji Holding A.Ş Type: Wind Size: Large Scale Crediting period: 2009-08-11 → 2030-08-10 Estimated annual credits: 97481 tCO2e SDGs: Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 6: Clean Water and Sanitation
Red Flags
- Open forward action requests remain, and the monitoring report also lists multiple corrective and clarification items that needed closure.
- The extracted record contains contradictions on leakage treatment, reversal events, and the crediting period, which weakens confidence in the documentation.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 10,215 | 10,215 | 0 | |
| 2010 | 33,743 | 33,743 | 0 | |
| 2011 | 67,768 | 67,768 | 0 | |
| 2012 | 58,885 | 58,885 | 0 | |
| 2013 | 63,484 | 63,484 | 0 | |
| 2014 | 64,006 | 64,006 | 0 | |
| 2015 | 86,355 | 86,103 | 252 | |
| 2016 | 82,292 | 81,919 | 373 | |
| 2017 | 75,264 | 75,264 | 0 | |
| 2018 | 77,841 | 77,841 | 0 | |
| 2019 | 80,414 | 80,414 | 0 | |
| 2020 | 86,281 | 75,227 | 11,054 | |
| 2021 | 78,917 | 5,079 | 73,838 | |
| 2022 | 84,716 | 81,618 | 3,098 | |
| 2023 | 73,347 | 42,342 | 31,005 | |
| 2024 | 86,550 | 0 | 86,550 | |
| 2025 | 47,971 | 0 | 47,971 | |
| Total | 1,158,049 | 903,908 | 254,141 |
Cosa migliorerebbe questo punteggio
- Provide the verified emission reduction totals and the calculation files so claimed versus verified issuance can be checked.
- Resolve the contradictions on leakage, reversal events, and crediting period with a clear document trail and updated verification evidence.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal events stated, but buffer treatment unclear
0% deduction with negligible justification
Project baseline, reassessment timing limited
FPIC and grievance mechanism documented
CORSIA-eligible; CCP status not mentioned
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Final_MR_1332 Duzova Wind_v05_27-02-2026.pdf
- Monitoring Report_monitoring period_01-09-2010 to 30-09-2011_v2.2.pdf
- Final_MR_1082 Düzova Wind_v09_07-10-2024_cc.docx
- Final_ER calculations_1082 Düzova Wind_v05-09-07-2024.xlsx
- Final_ER_1332 Duzova wind_v04_27-02-2026.xlsx
- GS672 Duzova WPP Annual Report.pdf
- +17 more
Other
- DuzovaWPP_TransitionAnnex_R3_clean_21122020.docx
- T-PreReview_V1.5-Project-Design-Document_Duzova WPP_v4_06.02.2024-cc.pdf
- Final_SDG Impact Tool_1083 Duzova Wind-CPRen_v1_03-05-2023.xlsx
- Final_CP Renewal Val Report_1083 Duzova Wind-CPRen_Sandeep Kanda _v03_08-02-2024_cc.pdf
- Final_SDG Impact Tool_1332_v03_27-02-2026.xlsx
pdd
registry_page
validation
- Verification Report_1st monitoring period_08.11.2009 to 08.31.2010_v2.pdf
- Final_Verification Report_1332 Düzova Wind_Kader ALKAÇ_v04_23-03-2026 (1).pdf
- Verification Report_monitoring period_01-06-2013 to 30-09-2014.pdf
- (1)Verification Report_4th monitoring period_06.01.2013 to 09.30.2014_v1.2.pdf
- (1)Verification Report_3rd monitoring period_10.01.2011 to 05.31.2013_v1.3.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →