CDMWindChinaACM0002

Da’an Haituo Wind Farm Phase I Project

CDM-6338 ↗

#1418of 1935 in Renewable energy#870of 1084 in China#1153of 1459 in CDM (UNFCCC)#1091of 1287 in ACM0002

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.5

Audit Analysis

A CDM wind farm project in China with a known VVB and a closed corrective action, but significant data gaps in additionality verification, verified emission reductions, and a striking discrepancy between the ex-ante lifetime estimate (96,899 tCO₂) and the first monitoring-period claim (33,452 tCO₂ for ~3 months), which is roughly 9.7× the pro-rata expectation. The baseline method is described inconsistently across documents (project-specific vs. jurisdictional), and several key MRV parameters are absent from the extracted record.

Red Flags

  • The monitoring report claims 33,452 tCO₂ for a ~3-month period, while the validation report's ex-ante lifetime estimate is 96,899 tCO₂ over 7 years; the pro-rata expectation for 3 months is ≈3,461 tCO₂, meaning the project delivered ~9.7× the expected share — a major over-crediting signal.
  • Baseline method is described as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction that undermines baseline credibility.
  • Additionality test type and VVB confirmation are not stated in any extracted document, leaving the additionality claim unverified in the available record.
  • No verified ERR figure (total_err_verified) is available; only the claimed figure from the monitoring report exists.
  • Grid emission factor appears as 0.9139 in the monitoring report and 1.1082 in an unidentified source document, with no reconciliation.

Credit Vintages

IssuedRetiredAvailable
2014
95,926095,926
2016
109,9120109,912
2022
115,5520115,552
2023
32,737032,737
Total354,1270354,127

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

Wind avoidance project; no reversal events reported

Leakage

0% deduction with quantified justification; appropriate for

Baseline

Method contradicts across documents (project vs. jurisdictio

Safeguards

Safeguards mentioned and benefit sharing described, but FPIC

Double-claim

CORSIA eligibility and CCP status not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-28ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents