Skip to main content
CDMWindChinaACM0002

Daan Laifu Wind Farm Phase III Project

CDM-7230 ↗

#1097of 1935 in Renewable energy#611of 1084 in China#828of 1459 in CDM (UNFCCC)#855of 1287 in ACM0002

5.0/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

The Daan Laifu Wind Farm Phase III is a CDM wind project with a jurisdictional baseline and no material findings or corrective actions, but the extracted record is limited to a validation report and PDD with no monitoring or verification data. Additionality verification is not explicitly confirmed in the available documents, and several key MRV fields (FNRB, monitoring period, usage tracking) are absent. The project presents moderate confidence with notable evidence gaps.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverified in available documents
  • No monitoring or verification reports are present in the evidence set; the only dated document is the validation report (30 Nov 2020), so actual performance against the 669,165 tCO₂e ex-ante estimate cannot be assessed

Credit Vintages

IssuedRetiredAvailable
2017
274,2860274,286
2022
357,1970357,197
Total631,4830631,483

Risk Indicators

Additionality

Test type and VVB confirmation not stated in extracted recor

Permanence

Wind avoidance project; no reversal events reported

Leakage

0% deduction, deemed negligible — reasonable for wind

Baseline

Jurisdictional baseline, grid EF 0.9139 (2017), set at valid

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-27ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents