DAGBASI HYDROELECTRIC POWER PLANT
Score Breakdown
Integrity
verified The verification/monitoring record shows additionality confirmed by the VVB via an investment test and no material findings or corrective actions reported (monitoring report, 2022).
missing Leakage is treated as negligible with a 0% deduction, and baseline reassessment timing is not stated, which weakens robustness for long monitoring periods (monitoring report, 2022).
Transparency
verified Claimed and verified emissions reductions are identical (57,843 tCO2e) for the stated monitoring period, supporting MRV consistency (monitoring report, 2022).
missing CORSIA and CCP status are not stated in the extracted record, limiting registry/eligibility transparency for buyers.
Claim Safety
verified The project uses a recognized small-scale renewable electricity methodology (AMS-I.D. v17.0) with a stated grid emission factor (monitoring report, 2022).
missing Safeguards and stakeholder-process claims are inconsistent across validation vs monitoring documentation, increasing greenwashing/reputational risk (validation report, 2014; monitoring report, 2022).
Documentation
verified Multiple core documents are available (PDD, validation report, monitoring report, issuance) and extraction confidence is high.
missing Contradictions between the validation report (2014) and monitoring report (2022) on safeguards-related items reduce confidence in narrative completeness.
Detailed Analysis
Integrity
Additionality is relatively strong because the VVB confirmed an investment test (monitoring report, 2022). The baseline is described as project-specific rather than standardized, and the timing of any baseline reassessment is not stated in the extracted record, which adds uncertainty over a multi-year monitoring period (monitoring report, 2022). Leakage is treated as negligible with a 0% deduction; while this can be reasonable for grid-connected renewables, the extracted record does not provide detailed justification beyond the negligible designation (monitoring report, 2022).
Transparency
The monitoring period is clearly stated (2014-04-11 to 2020-04-10) and the claimed and verified totals match exactly at 57,843 tCO2e, which supports transparent MRV outcomes (monitoring report, 2022). The VVB is identified (Re Carbon Gözetim Denetim ve Belgelendirme Ltd. Şti.), and no material findings or corrective actions are reported (monitoring report, 2022). However, CORSIA eligibility and CCP status are not stated in the extracted record, limiting transparency on downstream claim pathways.
Claim Safety
Over-crediting risk is moderated by the exact match between claimed and verified ERs and the use of an established renewable electricity methodology (AMS-I.D. v17.0) with a stated grid emission factor of 0.5299 (monitoring report, 2022). Claim safety is weakened by the project-specific baseline approach and the lack of a stated baseline reassessment date in the extracted record, which can matter for grid EF evolution over time. In addition, safeguards-related statements differ between early and later documents, which can elevate reputational/greenwashing risk for corporate claims (validation report, 2014; monitoring report, 2022).
Documentation
Documentation coverage is fairly good: the extracted record includes a PDD, validation report, monitoring report, and issuance evidence, with six documents used and high extraction confidence. The monitoring report is relatively recent (2022-11-21) compared with the crediting period start (2014-04-11), supporting recency for MRV. The main documentation weakness is internal inconsistency on safeguards-related disclosures between the validation report (2014) and monitoring report (2022), which reduces confidence in completeness and continuity of stakeholder-process reporting.
Overall
Overall quality is moderate-to-good for a VCS renewable avoidance project: additionality is VVB-confirmed and ER accounting is consistent (monitoring report, 2022). However, several safeguards-related items are contradictory across documents: the monitoring report (2022) indicates safeguards were mentioned, FPIC conducted, a grievance mechanism exists, and benefit-sharing is described, while the validation report (2014) indicates these were not present. For scoring, the more recent monitoring report values were privileged because they may reflect processes implemented over time, but the contradiction itself signals reliability risk and is scored down accordingly. CORSIA/CCP status is not stated in the extracted record, adding uncertainty for claim channel safety.
Audit Analysis
This is a grid-connected hydropower avoidance project under VCS with emissions reductions fully matched between claimed and verified totals for the monitored period. Additionality is confirmed by the VVB using an investment test, but baseline setting is project-specific and the timing of any baseline reassessment is not stated. Safeguards-related disclosures are inconsistent across documents, which increases reputational and reliability risk.
Project Description
Dagbasi Hydroelectric Power Plant (HEPP) (in the following: Project, Dagbasi HEPP) is a run-of river type power generating plant that will be constructed on the Sugozu Stream between the elevations of 510 m and 383.5 m. Project site is located in Province of Mersin, Anamur district in the Mediterranean Region. Sugozu Stream is a side branch of the Anamur River, which is also known as Dragon River. Project investor is a private enterprise, ALPEREN Elektrik Üretim A.S. (in the following: ALPEREN).
Red Flags
- Safeguards, FPIC, grievance mechanism, and benefit-sharing are reported in the 2022 monitoring report but were not reported in the 2014 validation report, creating a documentation consistency risk.
- Baseline is project-specific and the date of any baseline reassessment is not stated in the extracted record.
Credit Vintages
Nessuna emissione registrata sul registro.
Il marketplace dichiara i vintage: 2014, 2015, 2016, 2017 (non verificato).
Cosa migliorerebbe questo punteggio
- Provide a clear, consistent safeguards narrative across validation and monitoring, including dated evidence of FPIC, grievance mechanism operation, and benefit-sharing implementation.
- Disclose baseline reassessment timing and supporting calculations (including any grid EF updates) and provide fuller leakage justification for the 0% deduction.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; no reversal events reported
0% leakage with limited justification detail
Project-specific baseline; reassessment timing unclear
Safeguards/FPIC/grievance inconsistently documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →