Dalian Tuoshan Wind Power Project
#667of 1935 in Renewable energy#321of 1084 in China#461of 1459 in CDM (UNFCCC)#515of 1287 in ACM0002
Audit Analysis
The Dalian Tuoshan Wind Power Project is a low-risk avoidance-type CDM wind project with VVB-confirmed additionality, a jurisdictional baseline, and no material findings. However, the available documentation is limited to the PDD and validation report, with no monitoring reports or operational data in the extracted record, leaving several key parameters unverified. The VVB's conservative reduction of the claimed emissions reductions (from 728,959 in the PDD to 104,137 in the validation report) is a positive signal for claim integrity.
Red Flags
- No monitoring reports found in the extracted record; total_err_verified (104,137) matches the validation report figure exactly, suggesting it may be the validated ex-ante estimate rather than independently monitored output
- Significant discrepancy between PDD estimate (728,959 tCO2e) and validated figure (104,137 tCO2e) — an 86% reduction — warrants scrutiny of the PDD's initial assumptions
- Multiple key operational parameters (FNRB, usage rate, monitoring method, buffer pool) are not stated in available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 57,981 | 0 | 57,981 | |
| Total | 57,981 | 0 | 57,981 |
Risk Indicators
VVB-confirmed
Avoidance project, no reversal risk
0% with negligible justification
Jurisdictional, reassessed 2019
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →