Dam Bri 1 Hydropower Project
#425of 1935 in Renewable energy#21of 80 in Vietnam#273of 1459 in CDM (UNFCCC)#157of 806 in AMS-I.D
Audit Analysis
The Dam B'ri 1 Hydropower Project is a straightforward CDM grid-displacement hydro project with a VVB-confirmed investment additionality test and a reasonable 0% leakage deduction. However, the absence of any monitoring-period data, verified emission reductions, or usage-tracking information creates a significant evidence gap, and the low extraction confidence in the source documents limits assurance. The project's claims are internally consistent but cannot be independently corroborated against actual performance.
Red Flags
- No monitoring period data or verified emission reductions found in any available document — the 21,773 tCO2e lifetime claim cannot be cross-checked against actual performance
- Minimum extraction confidence rated low, indicating at least one key document was poorly readable, reducing assurance in the extracted facts
- Project-specific baseline with no recorded reassessment date, limiting confidence in the baseline's continued validity over the 7-year crediting period
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Grid-displacement hydro, no reversal risk
0% deemed negligible, appropriate for grid hydro
Project-specific, no reassessment date recorded
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →